location
Saarbrücken/ Saarland
architect
Hochstrasser.Neureuther, Neu-Ulm
construction volume
7 Mio EUR
year
2004 - 2005
material
reinforced concrete, steel, stonework
specifics
parts of building with different foundation depth
safety sections with high structural standards
basement with impermeable concrete as a “white basin”, sump drainage.
scope of work
Mike Sieder as project engineer of Schweitzer GmbH – consulting engineers:
project leader, structural design, static analysis in draft and detail planning, preparing construction plans.
|