location
Kassel/ Hessen
architect
NP, Kassel
construction volume
60 Mio EUR
year
2004 - 2005
material
reinforced concrete, steel, stonework
specifics
settling sensitive construction with different high construction parts
underground parking with impermeable concrete as a “white basin” and large prop arrangement.
scope of work
Mike Sieder as project engineer of Schweitzer GmbH – consulting engineers:
project leader, structural design, static analysis in draft and detail planning, preparing construction plans.
|